Project Description
Waste Water Treatment & Water Storage
6,160 Square Foot Water Storage Tanks
1,000,000 Gallons Per Day Treatment Plant
Our value engineering team recommended to change from a multi-step, concrete forming process to a single-step, cast-in-place concrete process which produced significant savings in cost and time. The facility has a sequential batch reactor built to handle high strength, peak hydraulic and loading conditions.